Terningen Arena

Country Norway
Type Office_Public_Building
Year 2010
Size 1650m²
Floor Boflex Champion

The construction began in January 2010, and the official opening took place this weekend 7-9. January 2011.

Facilities on site include sports hall, gymnasium, climbing-wall, concert hall, library, café offices and more. When the venue is set up for handball matches, there is seating for 2500 persons.

Key benefits:

  • Progressive shock absorption
  • Almost impossible to overload
  • High-level performance
  • Finished floor height 26mm without top-layer

Boflex carries the unique combination of a built-in shock absorption material and a stable construction that can withstand almost unlimited loads. This makes the floor system ideal for venues with multi-purpose usage (schools for examples) and large arenas. The uniform performance suits children as well as adults, with good bounce and friction. Even after twenty years, Boflex performs as day one.

Tests conducted by SINTEF (formerly The Norwegian Building Research Institute) shows that Boflex surpasses all its rivals and performs exceptionally well when being used by children and adults protecting body joints from shocks.

Boflex offers flexibility to accommodate your needs. Due to its extremely low building height, it is well suited for renovation purposes. The floor system is suitable with underfloor heating, for rolling loads and allows both hardwood and elastic surfaces (Boflex Champion).

Tests show that the system can withstand an almost unlimited load, due to the special built-in foam under-structure that can never be compresses more than 50% making the system suitable for tackling the heavy weight grandstands.

Boflex must be installed on an even and selfsupporting sub-floor, or on top of an existing floor.

Pictures: byggenytt.no